BC(A)R SI.9- BCMS: “must do better”

More than three months after the launch of the new national building regulation online I.T. system, Building Control Management System (BCMS), users have been told to submit all of the paperwork for the completion of every building project in the country…. on paper. (See link here)

Background

The new system has been developed by Fingal County Council with the Local Government Management Agency. Figures for the exact cost of the BCMS are not currently available, but we believe the quoted cost this year to date is in the region of €200,000 (See link here). It is unclear as to who tendered for, was awarded and then designed and developed the BCMS website late last year.

There have been widespread concerns about the security of the system, lack of password protection and security protocols (See links here and here🙂 and serious teething problems both for users and the local authorities (See link here).

Short Form Commencement Notice issues

The ‘short form’ Commencement Notice, for some smaller building works was not available for more than 2 months during which time the old version continued in use. These notices (approximately 174 submitted in March and April- see post here) may now be invalid as the old form was not in accordance with the new regulations. This is a concern for the legal status of these projects which may only become apparent in the future at conveyancing stage if the buildings involved are sold.

The ‘electronic’ short form was briefly available in May but was withdrawn because it required users to upload blank pages in order to complete their application. A paper version of the new short form is now is use; this must be posted to the local authority for them to scan and upload at an additional fee of €20 (BCA charges-2014)

Commencement Notices continue to fall

The official BCMS Building Register lists 509 Commencement Notices validated until 26th May 2014 (BuildingRegister26thMay-1). This figure contrasts with the Minister for the Environment’s assertion of 800 validated Commencement Notices in his letter to the Irish Times on 23rd May 2014 (see post here) . The Department have advised that they can verify the Minister’s figure but have not done so to date. This worrying trend for falling commencement notices seems to be consistent over the first 3 months since the introduction of the BCMS in March.

BCMS latest issue: paper only completion submissions and delays

The latest request for ‘paper’ completion documents is by far the most serious issue for owners and builders users. The new regulations make it illegal for a building to be ‘opened, occupied or operated’ before this file is validated by the local authority. The file for even a small extension will stretch to hundreds of documents and larger projects to many thousands. Printing, collating, filing and checking paperwork will place additional demands on the builders, professionals and local authorities.

This latest problem with the new BCMS  I.T. system may delay the completion of every building project by at least 7 days (under the regulations for paper submissions) and will also add cost, both in time and in local authority scanning fees. The additional upload charges are €60 per unit for residential and €80 per unit for commercial.

Of concern to many professionals is the fact that submission errors in the BCMS cannot be fixed (see recent comprehensive and helpful Cork County Council advice here) – the current problems in the system may inevitably end up in the courts with conveyancing problems, ‘illegal’ occupations that cannot be remedied, mortgaging problems and failed insurance claims. Many industry commentators feel that system may not be fit for purpose and should be withdrawn fully until it is fixed.

The construction industry is too important to the economy and job creation to be used for road testing a new IT system that is being built on the hoof.

Links mentioned in the above post:

Welcome to BCMS | localgov.ie – click link here

BCMS: 8 Apr 2014: Written answers (KildareStreet.com) – click link here

BReg Blog ALERT: Data Protection & BCMS – click link here

Is anyone checking Certifiers are registered? – click link here

ALERT: Cork CoCo guide to BC(A)R SI.9 – click link here

Commencement notices fall: BC(A)R SI.9 – click link here

BCA Charges 2014 – pdf link

building-control-administrative-charges-2014

BCMS | localgov.ie – click link here

Building Register (LGMA) May 26th 2014 –

excel doc BuildingRegister26thMay-1

Minister Hogan rejects Irish Times Article – click link here

Other posts of interest:

Is anyone checking if certifiers are registered? click link here

No checks of Designer,  Builder or Assigned Certifier on BCMS – click linkhere

BCMS- are we getting what is said on the label? – click link here

The BCMS system: a quickstart guide- click link here

Building Control Officers Survey – click link here

 

 

0 thoughts on “BC(A)R SI.9- BCMS: “must do better”

  1. Pingback: Minister-”Compliance matters that may go unnoticed…” | BRegs Blog

  2. Pingback: Minister-”Compliance matters that may go unnoticed…” | BRegs Blog

  3. Pingback: Press: Fears construction recovery will stall | BRegs Blog

  4. Pingback: Press: Fears construction recovery will stall | BRegs Blog

  5. Pingback: Press piece: BC(A)R causes surge? | BRegs Blog

  6. Pingback: Press piece: BC(A)R causes surge? | BRegs Blog

  7. Pingback: Engineers Ireland CPD 10th June | BRegs Blog

  8. Pingback: Engineers Ireland CPD 10th June | BRegs Blog

  9. Pingback: Build in 8 hours, wait 3 weeks for a Completion Cert! | BRegs Blog

  10. Pingback: Build in 8 hours, wait 3 weeks for a Completion Cert! | BRegs Blog

  11. Pingback: Press: Construction and property bouncing back as jobs surge | BRegs Blog

  12. Pingback: Press: Construction and property bouncing back as jobs surge | BRegs Blog

  13. Pingback: Opinion: Are builders + developers off the hook with BCAR? | BRegs Blog

  14. Pingback: Opinion: Are builders + developers off the hook with BCAR? | BRegs Blog

  15. Pingback: Commencement notices- Building Register @ 17th June 2014 | BRegs Blog

  16. Pingback: Commencement notices- Building Register @ 17th June 2014 | BRegs Blog

  17. Pingback: What is a “validated Commencement Notice”? | BRegs Blog

  18. Pingback: What is a “validated Commencement Notice”? | BRegs Blog

  19. Pingback: Taoiseach: get building back to ‘sensible, sustainable levels’ | BRegs Blog

  20. Pingback: Taoiseach: get building back to ‘sensible, sustainable levels’ | BRegs Blog

  21. Pingback: CSO: (Q1 2014) planning permissions for dwellings -30% drop | BRegs Blog

  22. Pingback: CSO: (Q1 2014) planning permissions for dwellings -30% drop | BRegs Blog

  23. Pingback: CSO: (Q1 2014) planning permissions for dwellings -30% drop | BRegs Blog

  24. Pingback: Building Inspector view of BC(A)R SI.9 | BRegs Blog

  25. Pingback: Building Inspector view of BC(A)R SI.9 | BRegs Blog

  26. Pingback: Building Inspector view of BC(A)R SI.9 | BRegs Blog

  27. Pingback: ‘Recovery’ is Still Worse than the 1980s Crisis | BRegs Blog

  28. Pingback: ‘Recovery’ is Still Worse than the 1980s Crisis | BRegs Blog

  29. Pingback: ‘Recovery’ is Still Worse than the 1980s Crisis | BRegs Blog

  30. Pingback: Irish Residential Property Prices: May 2014 | BRegs Blog

  31. Pingback: Irish Residential Property Prices: May 2014 | BRegs Blog

  32. Pingback: Irish Residential Property Prices: May 2014 | BRegs Blog

  33. Pingback: Commencement figures- June 25th 2014 | BRegs Blog

  34. Pingback: Commencement figures- June 25th 2014 | BRegs Blog

  35. Pingback: Commencement figures- June 25th 2014 | BRegs Blog

  36. Pingback: Press: RIAI fearful Local Authorities will start “finding something to invalidate as a method of workload control” | BRegs Blog

  37. Pingback: Press: RIAI fearful Local Authorities will start “finding something to invalidate as a method of workload control” | BRegs Blog

  38. Pingback: Press: RIAI fearful Local Authorities will start “finding something to invalidate as a method of workload control” | BRegs Blog

  39. Pingback: Top 20 for July 2014. | BRegs Blog

  40. Pingback: Top 20 for July 2014. | BRegs Blog

  41. Pingback: Top 20 for July 2014. | BRegs Blog

  42. Pingback: RIAI CPD July 2014: Design Certifier in the Design Process- SI.9 | BRegs Blog

  43. Pingback: RIAI CPD July 2014: Design Certifier in the Design Process- SI.9 | BRegs Blog

  44. Pingback: RIAI CPD July 2014: Design Certifier in the Design Process- SI.9 | BRegs Blog

  45. Pingback: Response- Workload on Local Authorities | BRegs Blog

  46. Pingback: Response- Workload on Local Authorities | BRegs Blog

  47. Pingback: Response- Workload on Local Authorities | BRegs Blog

  48. Pingback: Design Certifier – Can we leave it to the builder to sort out? | BRegs Blog

  49. Pingback: Design Certifier – Can we leave it to the builder to sort out? | BRegs Blog

  50. Pingback: Design Certifier – Can we leave it to the builder to sort out? | BRegs Blog

  51. Pingback: Alert to TD about new regulations | BRegs Blog

  52. Pingback: Alert to TD about new regulations | BRegs Blog

Leave a Reply

Your email address will not be published. Required fields are marked *